Recent Works

As of October 6, the following progress has being made:

  • 34.74% in the excavation of the Control works and spillway structure.
  • 72.22% in the excavation of the fourth terracing of the Powerhouse.

 

 
Creation of 5,000 direct jobs and 5,000 indirect jobs during its estimated construction duration of ...

| |
|