Project Description:
The overall scheme of the project can be described as follows: dam work of rocking type with a concrete surface with a height of 205,50 m measured from the placement of the base up to the parapet; River diversion works with 2 tunnels of portal section with a height of 14,00 m on MI; a precise upstream with a height of 36,5 m (including 5.0 m of gabions ) and a downstream case with a height of 22,0 m; open sky drainer with 6 bays for floodgates on the control zone located on the left margin and subterranean hydroelectric plant with a Powerhouse on cavern over the MD that hosts 2 turbo generator units of 375 MW each one.
| Type |
with concrete surface |
| Total height to placement |
220.00 m |
| Crest elevation |
579.00 m |
| Crest length |
628.77 m |
| Area to NAME |
33.40 km2 |
| Elevation to NAME |
578,0 msnm |
| Useful capacity for generation |
1 392 Mm³ |